← Scenic Design

Shakespeare Abridged

Scenic DesignerDesign developmentExplore the process
Shakespeare Abridged — design development

Exposed timber, theatrical framing, and room for comic invention.

A scenic concept for The Complete Works of Shakespeare (Abridged), built around an exposed framework of plank panels, ropes, and contrasting platform levels. The arrangement keeps an open central playing area, framed by a bold geometric sign and a deliberately theatrical structure.

The mood board explores weathered wood, warm neutral tones, rope, and the texture of a working theatre. Pencil elevations and ground plans develop into clean drawings that clarify the composition and movement through the space.

Design comparison
Clean scenic drawing
Pencil sketch
Pencil sketchClean scenic drawing

Drag to explore the development ← →

A working theatrical frame

Visible bracing, horizontal planks, and rope details create an adaptable background for a fast-moving comic performance.

Space for the ensemble

Platforms and stairs on both sides introduce changes in level while maintaining an open center. The ground plan studies how those elements relate to entrances and the main playing area.

Material and atmosphere

The research board brings together timber, rope, historic theatre architecture, and a warm palette. It records visual references and material direction for the developing design.

PROJECT GALLERY.

Next project

Songs for a New World

Contact Jagger